Machining

MACHINE-FACTORY
MANUFACTURE ORGANIZING

Necova specializes in providing a complete study regarding the total cost and time during the manufacturing process, while carefully assessing the number of machine centers required for production of specific parts. In collaboration with the machine center, Necova calculates the manufacture phase string down to the final part of product envelope. For every manufacturing phase Necova calculates the three cut force coordinates, the required manufacturing power and the power that must be generated by the electrogenerator. Moreover, Necova calculates the hourly burs production and develops the phases manufacture condition sheet (RPM, feed, etc) computing the total net minimum manufacture time.

Request Quote

Machining Calculation